Skip to product information
1 of 7

Vesgantti

Vesgantti 12 inch Twin Size Mattress, Hybrid Single Mattress in a Box with Memory Foam and Pocket Spring, Ergonomic Design & Pressure Relief, Medium Firm Feel, 39"*75"*12"

Vesgantti 12 inch Twin Size Mattress, Hybrid Single Mattress in a Box with Memory Foam and Pocket Spring, Ergonomic Design & Pressure Relief, Medium Firm Feel, 39"*75"*12"

Regular price $356.36 USD
Regular price $712.73 USD Sale price $356.36 USD
Sale Sold out
Shipping calculated at checkout.
Quantity

Brand: Vesgantti

Color: Black and White

Features:

  • Individual Pocket Spring: Supported by hundreds of quality and stainless Individual pocket spring, each spring work independently to offer an all-over and average support to 7 parts of your body (Feet, legs, hips, waist, shoulders, neck, head). Excellent shock-absorption and resilience, cater your vertebral well, help adjust and correct your sleeping posture. Note: Please keep distance when opening the mattress from the plastic packing, as it may have a risk to hit back when restoring
  • Vesgantti Luxury Support System: Memory foam and pocket spring support system also provide more buffers for your body, help relieve back pain, greatly improve your sleeping quality
  • Breathable and Healthy: Ultimate luxury slow springback foam made of high density and first-class temperature-sensitive material, fiberglass-free, cooling, breathable and comfortable, can expel the steamy sweat from the contact surface between you and mattress so to keep body comfortable and dry when sleeping
  • Ultra Quiet: Built-in high quality Individual pocket spring and slow springback foam, can effectively absorb the noise and vibration caused by tossing and turning when sleep, no waking up by the noise, not disturb companion and effectively reduce your turning times, let you sleep soundly and peacefully
  • Vacuum Roll Packed: It is delivery, compressed, vacuum sealed and neatly rolled in a box. Smaller size, easy to carry. Please allow 48 hours for the mattress to fully expand after unpacking. Thickness measurement tip: the distance from the height of the fully expanded foam to the bottom of the base. Please note: once the mattress open and restore, it cannot be roll back again

model number: twin mattress

Part Number: twin mattress

Package Dimensions: 42.0 x 13.0 x 13.0 inches

View full details